How Long Does an Office Fit-Out and Setup Take?
Opening a new office is a milestone for any company, but it raises a critical question: How long does it take to set up a new office space? As the saying goes, time is money. Long office moves can disrupt productivity, employee morale and profits.
Moving, expanding, or redeveloping your company premises—whatever the need—knowledge about the fit-out period is essential to enjoying a neat, quick, and stress-free setup.
This blog discusses the standard phases, timelines and factors that decide a fit-out. We will also observe how BuzzWorks, an end-to-end office solutions company, can provide a move-in-ready office within 2-3 months, significantly faster than a typical fit-out.
What is an Office Fit-Out? What Does it Entail?
An office fit-out process transforms a vacant or partially completed space into a fully functional office. Depending on the state of the building and the extent of your business needs, the fit-out process is typically split into three phases:
1. Shell and Core (If Applicable)
This is the minimum bare shell the building owner offers, including the structure, walls, and sometimes minimal utilities. If your office build-out is shell and core, your fit-out schedule will automatically be longer.
2. Category A Fit-Out
This level involves minimal finishes such as floors, ceilings, mechanical and electrical services, lights, and air conditioning. It provides the infrastructure required for additional customisation.
3. Category B Fit-Out
This is where your workspace optimisation starts. It comprises:
- Partitioning and wall finishes
- IT infrastructure and cabling
- Meeting rooms and breakout spaces
- Kitchens, washrooms and wellness areas
- Ergonomic furniture
- Branding, such as colour schemes and logos
A successful office interior fit-out results from thoughtful space planning, design, compliance and delivery, all in one place.
Office Fit-Out Timelines: A General Overview
The average time for the office fit-out process is 3 to 6 months, based on the complexity level of your requirements. Following is a phase-wise breakup:
1. Planning and Design (2-4 weeks)
This includes initial consultations, floor planning, 3D images, estimation and approvals. This phase completes workspace design and functional aspects, such as floor plans, mood boards and 3D renders.
2. Approvals and Permits (2-3 weeks)
Depending on the nature of the building and local regulations, landlord and statutory consent delays may affect your office fit-out program.
3. Construction and Fit-Out (6-12 weeks)
This is the execution phase, which involves partitioning, electrical work, HVAC installation, and other fit-out activities.
4. IT and Furniture Installation (1-2 weeks)
Fitting out your IT setup, internet connection and office furniture constitutes the last step before occupation.
5. Handover of the Project (Final Week)
Once the final quality checks and snag lists are completed, the space is handed over and ready for occupation.
Factors Affecting Fit-Out Schedules
Several factors can speed up or slow down your office fit-out:
- Size of the space: Smaller offices (e.g., 2,000 sq. ft.) can be completed faster than larger spaces (e.g., 20,000 sq. ft.).
- Degree of customisation: The more customised the design, the longer it will take.
- Building type: A refurbished building may require more compliance checks than a new building.
- Material availability: Late delivery or obtaining specialised materials will contribute to delays.
- Labour availability: An experienced, in-house labour force will significantly reduce delays.
- Client decision-making speed: Quick approvals = quick implementation.
- Technology complexity: Installing up-to-date IT systems can be time-consuming.
A Faster, Smarter Solution: BuzzWorks’ 2–3 Month Turnkey Solution
Need a fast office fit-out without compromising on quality?
BuzzWorks office setup offers a hassle-free design-to-delivery solution, delivering move-in offices within 60–90 days. This is how BuzzWorks can:
- Turnkey Office Solution: Start-to-finish fit-out is undertaken in-house, dispelling multiple vendor management and coordination issues.
- Plug-and-Play Workspaces: Deployed IT setups, ergonomic furniture, meeting rooms and brand-ready interiors translate into minimal downtime for your employees.
- Professional Fit-Out Project Management: BuzzWorks provides seasoned architects, engineers and project managers to get each fit-out project on time and within budget.
- Hassle-Free Setup: Real-time updates and dedicated relationship managers ensure a hassle-free transition.
From planning a business move to establishing a satellite office or finding trendy workspaces, BuzzWorks has you up and running without the typical hassles.
Advantages of a Quicker Office Setup
- Less Downtime: A faster setup enables employees to return to maximum production levels earlier, reducing losses due to prolonged downtime.
- Cost Control: Delays cost money, like temporary facilities and long-term leases. A tight-fit-out schedule avoids these costs.
- Improved Employee Morale: Employees perform better when working in a properly equipped, neat-looking environment. Delays in moving can negatively affect employee morale.
- Faster ROI: The earlier you’re operational and functional in your new premises, the earlier you begin reaping the rewards of your investment.
- Operational Efficiency: Quick delivery is not a compromise. With the right expertise, you can achieve high-quality office customisation in record time.
Final Thoughts: Plan Smart, Move Fast
A conventional office fit-out can take six months, but companies today cannot afford to waste that time. For this reason, plug-and-play offices provided by firms such as BuzzWorks are the ideal mix of speed, quality, and adaptability.
With end-to-end project management, custom design capabilities, and rapid deployment, BuzzWorks ensures your team can focus on performance and growth while it takes care of everything else. Whether planning a relocation, expanding into a new city, or setting up a satellite office, BuzzWorks helps you move smart, fast, and stress-free.
If you’re designing your next office setup, assess your needs, remember your fit-out timeline, and choose a provider capable of delivering efficiently without unnecessary stress. With a quick turnkey office solution, your business can concentrate on expansion, not setups.